This is Doosan Traing on Basic Hydaulic Concepts
This is Doosan Traing on Basic Hydaulic Concepts
adwert (4th March, 2017), ahmadgrt (15th June, 2013), dairydan (7th June, 2017), dreamrunner (3rd March, 2018), dupisa (6th December, 2017), hieu1987 (2nd June, 2013), igor75 (31st July, 2018), jacques01 (21st November, 2017), KHADIBI (14th December, 2021), Lokkung (3rd January, 2018), maknik (24th February, 2019), musaraun (19th June, 2023), phanminhnhat (23rd June, 2016), Roy Suryadwiananda (15th August, 2013), salwan (17th October, 2018), vic13r (17th January, 2018), wthepo (21st October, 2013)
Doosan- Hydraulic Symbols
adwert (4th March, 2017), ahmadgrt (15th June, 2013), dairydan (7th June, 2017), hieu1987 (2nd June, 2013), jacques01 (21st November, 2017), KHADIBI (12th December, 2021), maknik (24th February, 2019), phanminhnhat (23rd June, 2016), Roy Suryadwiananda (15th August, 2013), vic13r (17th January, 2018)
Here is a training video for Doosan Excavator, more will be posted later
This video contains Grease points and track adjustment procedure
Filters Replacement during servicing
Checking Power Mode Performance
I will not post the other videos but I have some interesting Training material in pdf format
Last edited by mathura; 27th June, 2012 at 03:45 PM.
ahmadgrt (15th June, 2013), dairydan (7th June, 2017), dupisa (25th October, 2018), hieu1987 (4th July, 2013), jacques01 (21st November, 2017), KHADIBI (12th December, 2021), maknik (24th February, 2019), musaraun (19th June, 2023), Roy Suryadwiananda (15th August, 2013), vic13r (17th January, 2018)
Doosan Electrical Training
Last edited by mathura; 28th June, 2012 at 11:02 AM.
Testing and Adjusting new Solar V-Series
Models:
S140W-V, S180W-V, S210W-V, S175LC-V, S225LC-V, S255LC-V -S300LC-V, S340LC-V, S420LC-V, S470LC-V
Contents:
I.Engine Control Cable & Speed
II.Auto Idle Engine Speed
III.Standard Mode Engine Speed
IV.Pilot Pressure
V.Main Relief & Pressure Up
VI.Power Shift Current & Pressure
VII.Speed Sensor
VIII.Working Mode
IX.Negacon Pressure
X.Px (PA) and Py(PT) Pressure
XI.High Travel Speed Signal
XII.Travel Motor Pressure
XIII.Swing Motor Pressure
XIV.Rock Breaker Flow Control Signal
Last edited by mathura; 28th June, 2012 at 11:10 PM.
ahmadgrt (15th June, 2013), andhikayudha (20th March, 2017), AnToX83 (22nd January, 2020), dairydan (7th June, 2017), dupisa (25th October, 2018), hieu1987 (2nd June, 2013), KHADIBI (12th December, 2021), musaraun (19th June, 2023), Roy Suryadwiananda (15th August, 2013), thangtn (14th September, 2015), vic13r (17th January, 2018)
New Solar V Training materialpart 1 & 2
Here are parts 3,4, & 5 of the Solar V Training
great work bro
Final Parts 6,7,& 8
DOOSAN Common Rail Electronic Engine Training-Part 1,2 & 3
1. Electrical engine system (Common Rail System)
2. Over view common rail engine ( DL06/ 08, DV11)
3. ECU
4. CP Pump8. Valve Gap Adjusting & Maintenance
5. Common Rail
6. Injector
7. Sensors
9. Fault Code
10. Trouble Shooting
Last edited by mathura; 5th July, 2012 at 01:20 PM.
dairydan (7th June, 2017), dupisa (22nd November, 2013), gmzysq (26th September, 2015), hieu1987 (4th July, 2013), hum autobpic (19th November, 2018), KHADIBI (12th December, 2021), Roy Suryadwiananda (15th August, 2013), salwan (17th October, 2018), thangtn (22nd June, 2017), thanos_argy (27th March, 2021), vic13r (17th January, 2018)
Parts 4,5,6, & 7
4. CP Pump
5. Common Rail
6. Injector
7. Sensors
dairydan (7th June, 2017), dupisa (25th October, 2018), gmzysq (26th September, 2015), hieu1987 (4th July, 2013), hum autobpic (19th November, 2018), KHADIBI (12th December, 2021), musaraun (19th June, 2023), Roy Suryadwiananda (15th August, 2013), thangtn (22nd June, 2017), vic13r (17th January, 2018)
Bookmarks