Just had my buyer survey back on the house I have an offer on, and there are 4 things on there that state "Before Exchange". These are:
1) Have the flat roof of the porch inspected for advice on replacement cost and timescale
2) Electrical circuit to be tested thoughout by qualified electrician
3) Gas supply and appliances tested by contractor who is Gas Safe registered
4)Heating and Hot water system tested by Gas Safe installer
My question is, am I responsible to have pay for these to be done, or is it the Vendor?
1) Have the flat roof of the porch inspected for advice on replacement cost and timescale
2) Electrical circuit to be tested thoughout by qualified electrician
3) Gas supply and appliances tested by contractor who is Gas Safe registered
4)Heating and Hot water system tested by Gas Safe installer
My question is, am I responsible to have pay for these to be done, or is it the Vendor?
Comment